Sunday, 7 September 2008

Day Nine




Welding done.

Loom in and electrics working, side repeaters in, glass in, steering column and pedals in, wiper motor etc in, clutch m/c in.

Thursday, 4 September 2008

Tuesday, 2 September 2008

Monday, 1 September 2008

Day Five


Welding fairies had been down the unit last night and welded another panel in - it's magical!

Sunday, 31 August 2008

Day Four

Been out and spent a fortune this weekend

Shock absorbers (all round)
Front window screen rubber
Window fillers for front and rear
Door seals
Brake hoses all round
Front brake pads


Had to cut out the rear jacking point, had about 4/5 patches upon patches, with rust inbetween.


Drivers side footwell cut out - several patches in that too. (Most not welded to each other?)


Passenger footwell has been welded up and fixed.


Fixed under the jacking point and the hole in the floor.



Big Thanks to John for doing the welding, and to Connie for sorting the wiring loom out!

Monday, 25 August 2008

Day Three

Fitted new upper and lower bump stops, got the steering column out, have taken the rear mounts off ready to be replaced with poly, and the teardrops.

Oh, and we cut some more holes and tipped the rusty one on to his side.




This has all been cut now and ready to go.



Floor not welded to the sill when repaired.






Parts listed updated